8-201.11 / WHEN PLANS ARE REQUIRED
Priority Foundation Item THIS FACILITY IS UNDERGOING REMODELING WITH EQUIPMENT REPLACEMENT/ADDITION, AND PLUMBING CHANGES.
SEND IN A COMPLETED PACKET FOR REMODELING OF THIS FACILITY. THIS MUST INCLUDE: - REMODEL/NEW CONSTRUCTION WORKSHEET - STANDARD OPERATING PROCEDURES - SPECIFICATION SHEETS FOR ALL NEW EQUIPMENT - SCALED DRAWINGS OF KITCHEN LAYOUT, PLUMBING AND LIGHTING; - THE PLAN REVIEW FEE OF $228. ALSO CONTACT ALL OTHER LOCAL AND STATE INSPECTORS REQUIRED, IF THIS HAS NOT BEEN DONE ALREADY. Correct By: 28-Sep-2016
Comments
UPON ARRIVAL AT THIS FACILITY, IT WAS FOUND THAT IT IS UNDERGOING REMODELING. NO REMODELING PERMIT WAS APPLIED FOR WITH THIS DEPARTMENT. THEREFORE, THIS FACILITY IS NOT IN COMPLIANCE WITH THE FOOD LAW. THIS IS DOES NOT INCLUDE CURRENT FOOD OPERATIONS, WHERE NO VIOLATIONS WERE NOTED.

THE MANAGEMENT OF THIS FACILITY SHALL DO THE FOLLOWING:

1) SUBMIT AN APPLICATION TO THIS DEPARTMENT FOR REMODELING, WHICH SHALL CONTAIN THE FOLLOWING:
- REMODEL/NEW CONSTRUCTION WORKSHEET;
- STANDARD OPERATING PROCEDURES THAT ARE APPLICABLE TO THE OPERATIONS AT THIS FACILITY;
- SPECIFICATION SHEETS FOR ALL NEW EQUIPMENT;
- SCALED DRAWINGS SHOWING THE LAYOUT OF THE KITCHEN AND EQUIPMENT; PLUMBING; LIGHTING IN THE KITCHEN;
- INCLUDE PLANS FOR REPLACING ALL DAMAGED FLOOR TILES, AND RESURFACING WALL SURFACES IF IT IS TO BE DONE;
- THE FEE OF $228 FOR PROCESSING THE REMODELING PERMIT;
2) APPLY FOR ANY AND ALL PERMITS REQUIRED BY LOCAL AND STATE LAW IF THEY HAVE NOT BEEN APPLIED FOR ALREADY.

ALL OF THIS SHALL BE ACCOMPLISHED BY NO LATER THAN SEPTEMBER 28, 2016. FAILURE MAY RESULT IN FINES OR CLOSURE OF THE FACILITY.

FOR QUESTIONS, CALL JEFF KOST AT (810) 257-3847.