[?] Violations: A summary of the violations found during the inspection are listed below. |
5-202.13 / BACKFLOW PREVENTION, AIR GAP Priority Item THE SPRAYER IN THE 1ST BAY OF THE THREE COMPARTMENT SINK IS RESTING INSIDE OF THE SINK. THE SPRAYER SHOULD REST ABOVE THE FLOOD RIM OF THE SINK. RAISE THE SPRAYER BY INSTALLING OR REPLACING THE SPRING. Provide an air gap between the drainline equipment and sewer system to protect water supply Correct By: 22-Aug-2017 |
Comments |
---|
TODAY'S VISIT IS TO CONDUCT A ROUTINE INSPECTION. THE FACILITY IS CLEAN AND ORGANIZED, THIS A NON-OPERATIONAL INSPECTION AS THERE IS NO FOOD BEING PREPARED OR SERVED. |