[?] A summary of the violations found during the inspection are listed below.

3701-31-04 (B)(1)(b) / SVRS device(s) shall be functional.
Critical Observed that the StingL (SVRS) was not functioning.
In order to reduce entrapment, the SVRS device that is being used as a secondary means to prevent entrapment/evisceration shall be brought back into operation. Ensure the SVRS is operating properly prior to placing the pool back into operation. Discussed this with PIC.
3701-31-04 (B)(6)(j) / All SVRS devices are maintained/ functional and tested
Critical Observed the StingL SVRS devices were not maintained or not functional.
In order to reduce the risk of entrapment, the SVRS devices shall be maintained or functional. Restore all SVRS devices to proper working order to prevent entrapment or evisceration. Discussed with PIC.


Inspection Information


Facility Type: Pool

[?] Inspection Type: Follow-up

Inspection Date: 20-December-2018

The following violation(s) have been corrected since the last inspection.
3701-31-04 (B)(1)(e)/Automatic Chemical Controller (ACC) shall function properly.
Observed that Automatic Chemical Controller (ACC) was not functioning properly at the time of the inspection (no flo).
In order to reduce the risk of potential health and safety hazards, ensure that the ACC unit is functioning properly. Discussed this with PIC.
3701-31-04 (B)(6)(k)/Outlet drain covers are secure/meet ANSI/ASME A112.19.8-2007 requirements.
Observed that the equalizer lines (below the skimmers) were not in compliance.
In order to reduce the risk of safety hazards, outlet covers shall meet ANSI/ASME A112.19.8-2007 standards. Replace nonapproved outlet covers with covers that meet the ANSI/ASME A112.19.8-2007 standard. Equalizer lines shall have compliant covers or be removed or plugged. Discussed this with PIC.
Comments
Have contacted ODH in regards to the SVRS requirement. Will keep trying to contact the state to find out what needs to be done.