3701-31-04 (B)(6) / Equipment is maintained per manufacturers specifications.
Equipment was not maintained per manufacturers specifications. The connection point, where the tubing from the Stenner pump connects to the PVC pipe leading back to the pool, has a leak. In order to ensure that disinfectant is dispensed into the pool at the proper concentration, it is necessary that all tubing be intact and well-sealed to connections. Repair or replace this connection. Discussed with the PIC, who indicated that the leak would be repaired.
All equipment must be maintained in accordance with the manufacturers specifications.
Facility Type: Pool
[?] Inspection Type: Standard
Inspection Date: 29-May-2020
Comments |
---|
The pH could not be measured due to sudden rain. The pH will be checked at the June inspection. Pool approved to open. Discussed COVID-19 plans and procedures. Thank you. |