[?] A summary of the violations found during the inspection are listed below.

No critical violations were documented at the time of inspection.

No violations were documented at the time of inspection.


Inspection Information


Facility Type: Pool

[?] Inspection Type: Standard

Inspection Date: 02-June-2023

Comments
Pool not open yet for use by the residents. Still working on conditioning the water chemistry and clarity of the pool water. Management hopes to open the pool this weekend weather permitting. Pool water slightly cloudy yet the main drain covers and the bottom of the pool was easily seen during the inspection. Needs to be clear for the and the water chemistry in approved ranges before the pool is opened for the residents to use.