No critical violations were documented at the time of inspection.
No violations were documented at the time of inspection.
Facility Type: Pool
[?] Inspection Type: Standard
Inspection Date: 26-September-2014
Comments |
---|
Pool is not yet open - please adjust all chemicals before opening. Raise the alkalinity to at least 60 ppm, adjust pH to 7.2-7.8, and adjust chlorine residual to at least 2 ppm. |