[?] A summary of the violations found during the inspection are listed below.

No critical violations were documented at the time of inspection.

No violations were documented at the time of inspection.


Inspection Information


Facility Type: Pool

[?] Inspection Type: Standard

Inspection Date: 16-February-2023

Comments
Spoke to Tiffany Henry, Desk Clerk.

She indicated that the pool was still CLOSED, but it was hoped that it would be ready to be opened in March 2023.
She indicated that the operation would call the Health District when the pool was ready to open at 937-390-5600 ext 245.

Please ensure that prior approval is received from the Ohio Department of Health for all renovations that require the submission of a Public Swimming Pool Equipment Replacement Notification. For more information on which repairs and renovations need prior approval, please contact the ODH Environmental Engineering Department at 614-466-1390.

A check of health district records indicates that the current VGBA compliant main drain cover(s) for the in-ground pool may be due for replacement. Please check the installation paperwork associated with the drain cover(s) and the expiration date molded into the drain cover(s). Please make arrangements, if needed, while the pool is being renovated, to replace the drain cover(s).

For more information, please call Anne Kaup-Fett at 937-390-5600 ext 245.

Thank you.