[?] A summary of the violations found during the inspection are listed below.

3701-31-04 (B)(1)(b) / SVRS device(s) shall be functional.
Critical Observed the SVRS not functioning.
The SVRS device that is being used as a secondary means to prevent entrapment/evisceration was not functional at the time of the inspection. Do not operate the pool when the SVRS is not functioning. Ensure the SVRS is operating properly prior to placing the pool back into operation. PIC closed the pool until the SVRS is functioning.
3701-31-04 (B)(4)(a)(ii) / Combined chlorine is tested daily at pool side prior to use
Repeat Observed that combined chlorine was not tested daily.
Combined chlorine shall be tested daily prior to bathers entering the public pool and every 4 hours the pool is open for use. If ACC is in use combined chlorine must be tested every 12 hours while the pool is in use. For spraygrounds and spray features, the combined chlorine must be tested at 1 spray feature every 6 hours the sprayground or spray feature is in use. Ensure that combined chlorine shall be tested and recorded everyday.


Inspection Information


Facility Type: Pool

[?] Inspection Type: Standard

Inspection Date: 24-May-2018