[?] A summary of the violations found during the inspection are listed below.

No critical violations were documented at the time of inspection.

No violations were documented at the time of inspection.


Inspection Information


Facility Type: Commercial RFE < 25000 sq. ft.

[?] Inspection Type: Consultation

Inspection Date: 09-June-2021


Comments
COMPLIANCE INSPECTION:
FACILITY NEEDS SOME IMPROVEMENTS BEFORE APPLICATION CAN BE GIVEN. THE BATHROOM FLOOR AND CEILING NEED REPAIRS AND THE BATHROOM COVING NEEDS TO BE REPLACED. IN ADDITION THE HVAC VENTS, IN THE CASHIER AREA NEED COVERS AND THE CEILING NEEDS REPAIRED ABOVE THE CASHIER. IN THE BACK ROOM COVING NEEDS TO BE INSTALLED AND THE WALLS WHICH ARE WOOD NEED TO BE COVERED WITH A SMOOTH AND EASILY CLEANABLE MATERIAL SUCH AS FRP PANELS.


Inspection Outcome: