3717-1-06(A)(1) / Indoor areas - surface characteristics
Observed floors, walls, and/or ceilings that were not constructed of approved materials.
reseal the one remaining ceiling tile which is located above the reach-in cooler.
Note: the owner states this is currently schedule for completion.
Where FSO or RFE activities are conducted, materials for indoor floor, wall, and ceiling surfaces shall be smooth, durable, and easily cleanable; closely woven and easily cleanable carpet for carpeted areas; and nonabsorbent for areas subject to moisture. Correct By: 11-May-2017
Facility Type: Commercial RFE < 25000 sq. ft.
[?] Inspection Type: Standard
Inspection Date: 01-May-2017
Comments |
---|
Note: the exterminating information is to be provided |