3701-31-04 (D)(7)(d) / Flow or pressure switch with a shut off valve shall be provided and tested monthly.
Critical Flow or pressure switch for a shut off valve was not provided or the unit was not tested monthly
Have the ACC unit serviced or replaced with a unit that has a flow or pressure switch with an automatic shut off valve. Provide records indicating that the unit is being tested monthly.
3701-31-04 ( D )(6)(a) / ORP reading shall be 650 millivolts or greater.
Repeat ORP reading was below 650 mv
Have the ACC unit inspected to determined why the ORP is low.
3701-31-04 (B)(6)(h) / Required meters and gauges maintained/functional
Repeat Required meters and gauges were not maintained or were not functional while the pool is in operation. Flow meter appears stuck.
Maintain all meters and gauges in a properly funtioning manner at all times while the pool is in operation.
Facility Type: Pool
[?] Inspection Type: Standard
Inspection Date: 22-November-2017
Comments |
---|
Readings must be recorded every 4 hours until automatic controller is properly functioning. List of approved automatic controllers is attached. Also, the flotation device is in poor repair. |