[?] A summary of the violations found during the inspection are listed below.

3701-31-04 ( D )(6)(a) / ORP reading shall be 650 millivolts or greater.
Repeat ORP reading was below 650 mv. The ORP was 574.
Have the ACC unit inspected to determined why the ORP is low. Correct By: 05-Jul-2021
3701-31-04 (B)(6)(h) / Required meters and gauges maintained/functional
Repeat Required flow meter gauge was not functional while the pool is in operation. The flow meter was stuck again and had sand and air bubbles. The PIC issued a work order for repair or replacement.
Maintain all meters and gauges in a properly functioning manner at all times while the pool is in operation. Correct By: 05-Jul-2021


Inspection Information


Facility Type: Pool

[?] Inspection Type: Standard

Inspection Date: 28-June-2021

Comments
Ensure noted findings are corrected before next routine inspection. Otherwise, all other water parameters were within requirements.