[?] A summary of the violations found during the inspection are listed below.

3701-31-04 ( D )(6)(a) / ORP reading shall be 650 millivolts or greater.
Repeat ORP reading was below 650 mv
Have the ACC unit inspected to determined why the ORP is low.
3701-31-04 (B)(1)(c) / Minimum disinfection residual shall be maintained as required.
Critical Repeat Chlorine disinfectant residual was less than 1 ppm for the pool. Corrected. Chlorine hand fed during inspection.
Do not operate the pool when the disinfectant residuals are less than what is required. Ensure the chlorine disinfectant residual is at 1 ppm or above prior to placing the pool back into operation.
3701-31-04 (B)(4)(a)(i) / Disinfection residuals are tested daily at pool side at required intervals for pools/automatic chemical controllers/special features
Repeat Disinfection residuals were not tested daily at pool side and/or at the required intervals for pools/automatic chemical controllers/special features. Readings not recorded every 4 hours as required due to the nonfunctioning automatic controller.
Test the disinfection residual every day before bathers enter the water. Disinfection residual must then be tested every 4 hours when an ACC is not in use. If an ACC is in use the disinfectant residual must be tested every 12 hours while the pool is in use. For spraygrounds and spray features, the disinfectant residual must be tested at 1 spray feature every 6 hours the sprayground or spray feature is in use.
3701-31-04 (B)(4)(a)(iii) / pH is tested daily at pool side at required intervals for pools/automatic chemical controllers/special features
Repeat pH was not tested daily at pool side and/or at required intervals for pools/automatic chemical controllers/special features. PH not being tested as required.
pH must be tested prior to bathers entering the water and every 4 hours the pool is open for use. If ACC is in use pH must be tested every 12 hours while the pool is in use. For spraygrounds and spray features, the pH must be tested at 1 special feature every 6 hours the sprayground or spray feature is in use.
3701-31-04 (D)(7)(d) / Flow or pressure switch with a shut off valve shall be provided and tested monthly.
Critical Repeat Flow or pressure switch for a shut off valve was not provided or the unit was not tested monthly
Have the ACC unit serviced or replaced with a unit that has a flow or pressure switch with an automatic shut off valve. Provide records indicating that the unit is being tested monthly.


Inspection Information


Facility Type: Pool

[?] Inspection Type: Standard

Inspection Date: 05-December-2017

Comments
Note: The automatic controller must be repaired/replaced as it is no longer properly functioning. Readings must be taken and recorded every 4 hours until replaced.