[?] A summary of the violations found during the inspection are listed below.

3701-31-04 (B)(4)(a)(ii) / Combined chlorine is tested daily at pool side prior to use
Combined chlorine was not tested daily at pool side prior to use.
Test for combined chlorine prior to bathers entering the water and every 4 hours the pool is open for use. If ACC is in use combined chlorine must be tested every 12 hours while the pool is in use. For spraygrounds and spray features, the combined chlorine must be tested at 1 spray feature every 6 hours the sprayground or spray feature is in use.
3701-31-04 (C)(3) / Total alkalinity is at or greater than 60 ppm
Repeat Total alkalinity was less than 60 ppm.
Raise the total alkalinity to at least 60 ppm.


Inspection Information


Facility Type: Pool

[?] Inspection Type: Standard

Inspection Date: 25-July-2018

Comments
all chemicals within required ranges. please start recording combined chlorine