No critical violations were documented at the time of inspection.
No violations were documented at the time of inspection.
Facility Type: Pool
[?] Inspection Type: Follow-up
Inspection Date: 09-July-2015
The following violation(s) have been corrected since the last inspection. |
---|
3701-31-04 ( D )(6)(a)/ORP reading shall be 650 millivolts or greater. ORP reading was below 650 mv Have the ACC unit inspected to determined why the ORP is low. |
3701-31-04(D)(6)(a)(2)/Pool free chlorine disinfectant residual shall be above 1 ppm. Pool free chlorine disinfectant residual was below 1 ppm. Do not operate the pool until the chlorine disinfectant residual is at 1 ppm or above. |
Comments |
---|
Thank you for correcting chlorine levels. |