3701-31-04 ( D )(6)(a) / ORP reading shall be 650 millivolts or greater.
ORP reading was below 650 mv
Have the ACC unit inspected to determined why the ORP is low.
Facility Type: Spa
[?] Inspection Type: Standard
Inspection Date: 31-January-2024
Comments |
---|
The facility is clean at the time of inspection. ORP is below 650 mv; chemistry levels are within required range. |