No critical violations were documented at the time of inspection.
No violations were documented at the time of inspection.
Facility Type: Pool
[?] Inspection Type: Standard
Inspection Date: 20-May-2016
Comments |
---|
No problems noted at the time of the inspection. Pool passed final construction inspection today by the ODH. OK to operate. |