3701-31-04 (B)(6)(f) / Required turnover rates are sufficient
Flow at 50.
Have the circulation system evaluated to determine why the turnover rates are not able to be met. Once the reasons have been determined have the issue repaired. If necessary, submit plans to the Ohio Department of Health to review and approve.
Facility Type: Pool
[?] Inspection Type: Standard
Inspection Date: 14-July-2015
Comments |
---|
All chemicals within required ranges. Please ensure flow is at minimum for pool (83) to ensure complete circulation within required time. |