[?] A summary of the violations found during the inspection are listed below.

3701-31-04 ( D )(6)(a) / ORP reading shall be 650 millivolts or greater.
Repeat ORP reading was below 650 mv.
Have the ACC unit inspected to determined why the ORP is low.
3701-31-04(D)(6)(a)(1) / Combined chlorine shall not exceed 1.0 ppm.
Combined chlorine was greater than 1.0 ppm.
Treat the pool so that the combined chlorine is less than 1 ppm.


Inspection Information


Facility Type: Pool

[?] Inspection Type: Standard

Inspection Date: 19-June-2017